The client is a US-based developer of a messaging platform. They had a reporting system in place, but it was implemented without a proper engineering approach: features were built in isolation, a mix of cloud and on-premise environments made the codebase impossible to navigate, and documentation was entirely missing.

Automation
United States
N/A
Data Engineering
Backend Development

400Gb

Data Warehouse Size Managed

40%

Reduction in Design Development

58%

Reduction in Total Dev Time
[ Challenge ]

A Reporting System Built Without Engineering Discipline

The client had a reporting system for their messenger platform, but the previous team implemented it without a proper engineering approach:

  • Each feature was built in isolation with no coherent architecture.
  • A mix of cloud and on-premise environments plus multiple languages (Python, Perl, SQL, Bash) made locating specific features impossible.
  • Documentation was entirely missing.

The data warehouse held 400Gb of data. The ETL ran once a day processing 1Gb across 150 tenants, generating 3,000 reports emailed daily.

[ Solution ]

Building the Solution

Our team analyzed the solution and improvement requests, designed a new architecture, and selected scalable, cost-effective tools. We developed the data warehouse, ETL process, Customer Portal, and Reports from scratch, then enabled direct access to data in the multi-tenant data warehouse.

  • Analysis: Documented the former solution's version and all improvement requirements.
  • Proposal: Prepared a new solution proposal covering architecture, mailing features, and software tooling.
  • Transition: Implemented the project and made a smooth transition from the old solution to the new one.

Impact that Matters

[ Results]

The team delivered a simple, well-documented solution ready to scale. The new version only charges during active processing rather than when idle, making it cost-effective.

58% faster delivery

Total development time was reduced by 58% compared to the original system, thanks to a coherent architecture and clearly defined tooling from the start.

40% faster design dev

Web app design development was reduced by 40% through reusable components and a well-structured design system applied across the Customer Portal.

Cost-efficient and scalable

The new solution is well-documented and scalable, only charging during active processing rather than when idle, giving the client meaningful infrastructure cost savings.

[ Tech Stack ]

Tech Stack

Visuals

[ Case Studies ]

Explore More
Success Stories

We have helped over 200 businesses grow their value and improve how they work through better software.

No items found.

Accelerate Your Digital Transformation

Let's discuss how we can engineer your success.
Dmitry Klim
Head of Growth
5900 Balcones Drive #21729, Austin, TX 78731
+1 (512) 921-9631
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.